City of
Chapter II, Art. 37 Sec. 1, Fees Updated July 1, 2009 in accordance with C.O. 92-306
Article 37 - Schedule
of
Section 1. Effective July 1, 1992, the City of Bangor Code Enforcement Officer shall change the charges for permits issued by or through that office. See attached schedule of fees.
Section 2. The fee prescribed by this ordinance shall supersede any existing City ordinance provisions that are inconsistent with the schedule as set forth in Section 1 above.
**
All new
construction (residential and commercial) permits shall be based on a fee
multiplier of .007 multiplied against total construction costs derived from
appropriate calculations pursuant to the adopted BOCA type of construction
method/permit fees as presented to the City of Bangor and in effect as of July
1 in any calendar year. New section, see examples.
EXISTING RESIDENTIAL CONSTRUCTION: including, but not limited to remodeling, new fences, decks, swimming pools, foundations, utility buildings, concrete slabs, garages, additions, fire escapes, handicap ramps.
FEE: $34.00 minimum plus $6.00 per $1,000.00 of construction cost over $2,500.00. No maximum fee.
EXISTING NON-RESIDENTIAL CONSTRUCTION: including, but not limited to remodeling, additions, alterations, fences, concrete slabs, canopies, accessory structures.
FEE: $49.00 minimum plus $6.00 per $1,000.00 of construction cost over $2,500.00. No maximum fee.
AMENDMENTS TO BUILDING:
Increase cost of work as per schedule above.
BELATED FEE FOR LATE APPLICATION AFTER
WORK HAS BEEN STARTED:
Any work started without benefit of a permit shall be served a Stop Work Order, and, if subsequently permitted, pay 50% additional to the required permit fee.
* Amended June 22, 1992, C.O. 92-306
** Amended July 27, 1992, C.O. 92-372
1.
City of
PORTABLE SWIMMING POOLS:
Permanent in-ground or above-ground not conforming to portable pool requirements, based on cost of work as above. With side heights of 30 and/or gallon capacity of 1,200 gallons or more.
FEE: $34.00
OBSERVATION STANDS AND AMUSEMENT STANDS:
Temporary Stands:
FEE: $55.00
Permanent Stands: - based on construction cost as on previous page.
MOVING OF BUILDING:
Removal of a building or structure from one lot to another or to a new location on the same lot.
FEE: $38.00 plus 100% of any direct cost for services provided by the City.
PARKING LOTS:
25 - 100 Spaces FEE: $ 78.00
101 - 300 Spaces - FEE: $116.00
301 or more - FEE: $194.00
EXCAVATION:
Grading and filling as defined by the Land Development Code.
FEE: $38.00
DEMOLITION:
Dwelling, structure or interior - FEE: $41.00 plus $10.00 for each story over (3) stories.
Small Structures: such as garage or shed with no sewer connections - FEE: $11.00
BELATED FEE WILL BE CHARGED WHERE DEMOLITION HAS BEEN COMMENCED WITHOUT BENEFIT OF A PERMIT. A STOP WORK ORDER WILL BE ISSUED AND THE FEE DOUBLED BEFORE A PERMIT IS ISSUED.
2.
City of
II. CERTIFICATE OF OCCUPANCY:
Inspections to be dictated by cost of construction from BOCA fee structure calculations.
Inspection fees will be charged dependent on project costs and staff inspection time incurred
based on the following scale:
CATEGORY
|
CONSTRUCTION COST |
FEE |
TIME |
|
|
|
|
|
Change of Occupancy
|
No Construction |
$ 11.00 |
n/a |
Category F Permit
|
$0 - $2,500 |
$ 11.00 |
n/a |
Category E Permit
|
$2,501 - $7,500 |
$ 80.00 |
1/2 hr |
|
Category D Permit |
$7,501 - $175,000 |
$123.00 |
3/4 hr |
|
Category C Permit |
$175,001 - $300,000 |
$160.00 |
1 hr |
|
Category B Permit |
$300,001 - $1,000,000 |
$325.00 |
2 hrs |
Category A Permit
|
$1,000,001 Maximum |
$485.00 |
3 hrs |
III. SIGN PERMITS:
FEE: $29.00 per sign
IV. ELECTRICAL PERMITS:
Temporary service . $34.00
Additional residential Wiring $34.00
New wiring or rewiring of single and two-family structures $61.00
New wiring or rewiring over two-family structures .. $61.00 plus $22.00 for each
additional unit over two
Service entrance - new or changeover $34.00 per entrance
Commercial $61.00 minimum plus 1/2 of 1%
of cost of the job
THERE WILL BE A SEPARATE CHARGE FOR EACH ITEM LISTED ABOVE, EVEN IF THE WORK PERFORMED IS LOCATED ON THE SAME JOB SITE.
BELATED FEE:
Any work started without benefit of permit after one business day, after receipt of notice, if subsequently permitted; pay double the required permit fee.
3.
City of
V. PLUMBING
PERMITS:
$24.00 minimum for 1-4
fixtures. $6.00 for each additional fixture over 4.
Table 110.2
Permits for complete disposal system:
Engineered
system (includes one Disposal Area) $200.00
Non-engineered
system $100.00
Primitive
system (includes one alternative toilet) $100.00
Separate
laundry disposal field $
35.00
Seasonal
conversion permit $
50.00
Variance
(is added to permit fee) $ 20.00
Permits for individual components of disposal
system:
Alternative
toilet (only) $
50.00
Disposal
field (engineered system) $150.00
Disposal
field (non-engineered system) $
75.00
Treatment
tank (non-engineered system) $
50.00
Treatment
tank (engineered system) $
80.00
Holding
Tank $100.00
Variance (is added to permit fee) $
20.00
VI. YARD
SALE PERMITS/SALE OF PERSONAL PROPERTY/TAG SALE/GARAGE
Two permits allowed per year.
1st permit $ 5.00
2nd permit (60 days after 1st) $ 11.00
VII. WOOD STOVE PERMIT $ 14.00/stove
VIII. MINIMUM ENERGY STANDARDS $ 5.00
IX. OIL BURNER FEES:
For a residential
replacement burner or new installation with a firing rate up
to 2 1/2
gallons/hour or up to 200,000 BTUs (1 gallon = 134,000 BTUs)
.. $34.00
For light commercial firing rate over 2 1/2 gallons/hour up to 7 1/2 gallons/hour
or over 200,000 BTUs up to 1 million BTUs
..
..
.
. $49.00
Heavy commercial
firing rate over 7 1/2 gallons per
hour or over 1 million BTUs
to 2 million BTUs
..
.. $78.00
Industrial over 15 gallons/hour and over 2 million BTUs
.
. $110.00
4.
City of
X.
SPRINKLER
SYSTEMS:
If under 10 heads . $ 5.00
Over 10 heads or under 50 .. $ 20.00
Over 50 heads $ 54.00
Over 100 heads .. $ 75.00
Add $10.00 for each story over 1st
Over 50 heads requires plans review . $ 34.00
Fire
and Intrusion Alarms .
$ 49.00
Xl. TANKS:
Underground and above ground tanks 331 gallons to 300,001 or more,
gasoline, fuel or oil tanks $49.00
Liquefied gases 125 to 120,000 gallons or more water capacity, under
and above ground $49.00
BELATED FEE FOR ALL EXCEPT SPECIFICALLY NOTED $37.00
additional
XII. APPEALS BOARD:
Board of Appeals $ 91.00
Advertising .. $ 44.00
Total $135.00
XIII. AUTOMATIC ANNUAL ADJUSTMENTS
to the adopted fee schedule will be made effective July
1 each year based on changes to the Consumer Price Index.
A. Gross square footage a. ____________________
B. Multiply a by type of construction
Factor (see table) ________ b. ____________________
C. Multiply b by fee multiplier .007
= Permit Fee c. ____________________
*Gross area x type of construction (table) x permit fee multiplier =
permit fee.
5.
|
City
of |
|||||||||||
|
|
|||||||||||
|
Group (2006 |
Type of Construction |
||||||||||
|
|
1A |
1B |
2A |
2B |
3A |
3B |
4 |
5A |
5B |
||
|
A-1 |
Assembly, theaters, with stage |
198.09 |
191.69 |
187.24 |
179.39 |
168.88 |
163.90 |
173.66 |
154.09 |
148.42 |
|
|
Assembly, theaters, without stage |
179.41 |
173.01 |
168.56 |
160.71 |
150.24 |
145.26 |
154.97 |
135.45 |
129.78 |
||
|
A-2 |
Assembly, nightclubs |
151.36 |
147.12 |
143.38 |
137.79 |
129.74 |
126.09 |
132.96 |
117.61 |
113.65 |
|
|
A-2 |
Assembly, restaurants, bars, banquet halls |
150.36 |
146.12 |
141.38 |
136.79 |
127.74 |
125.09 |
131.96 |
115.61 |
112.65 |
|
|
A-3 |
Assembly, churches |
182.56 |
176.16 |
171.71 |
163.86 |
153.36 |
148.38 |
158.12 |
138.57 |
132.90 |
|
|
A-3 |
Assembly,general,community halls, libraries,museums |
154.36 |
147.97 |
142.51 |
135.66 |
123.58 |
120.18 |
129.93 |
109.37 |
104.69 |
|
|
A-4 |
Assembly, arenas |
178.41 |
172.01 |
166.56 |
159.71 |
148.24 |
144.26 |
153.97 |
133.45 |
128.78 |
|
|
B |
Business |
153.33 |
147.81 |
143.08 |
136.34 |
124.01 |
119.35 |
131.00 |
108.67 |
104.20 |
|
|
E |
Educational |
168.14 |
162.47 |
157.86 |
150.98 |
141.50 |
134.27 |
145.99 |
124.54 |
119.84 |
|
|
F-1 |
Factory and industrial, moderate hazard |
92.98 |
88.72 |
83.61 |
80.88 |
72.40 |
69.23 |
77.63 |
59.62 |
56.41 |
|
|
F-2 |
Factory and industrial, low hazard |
91.98 |
87.72 |
83.61 |
79.88 |
72.40 |
68.23 |
76.63 |
59.62 |
55.41 |
|
|
H-1 |
High hazard, explosives |
87.15 |
82.89 |
78.78 |
75.05 |
67.75 |
63.57 |
71.80 |
54.97 |
N.P. |
|
|
H234 |
High hazard |
87.15 |
82.89 |
78.78 |
75.05 |
67.75 |
63.57 |
71.80 |
54.97 |
50.76 |
|
|
H-5 |
HPM |
153.33 |
147.81 |
143.08 |
136.34 |
124.01 |
119.35 |
131.00 |
108.67 |
104.20 |
|
|
I-1 |
Institutional, supervised environment |
153.80 |
148.53 |
144.55 |
138.69 |
129.50 |
125.96 |
139.98 |
117.23 |
112.64 |
|
|
I-2 |
Institutional, hospitals |
258.06 |
252.55 |
247.81 |
241.07 |
228.10 |
N.P. |
235.73 |
212.76 |
N.P. |
|
|
I-2 |
Institutional, nursing homes |
180.45 |
174.93 |
170.20 |
163.46 |
151.54 |
N.P. |
158.11 |
136.20 |
N.P. |
|
|
I-3 |
Institutional, restrained |
176.22 |
170.71 |
165.97 |
159.23 |
148.16 |
142.50 |
153.89 |
132.82 |
126.35 |
|
|
I-4 |
Institutional, day care facilities |
153.80 |
148.53 |
144.55 |
138.69 |
129.50 |
125.96 |
139.98 |
117.23 |
112.64 |
|
|
M |
Mercantile |
112.50 |
108.26 |
103.52 |
98.92 |
90.48 |
87.82 |
94.09 |
78.34 |
75.38 |
|
|
R-1 |
Residential, hotels |
155.77 |
150.50 |
146.52 |
140.66 |
131.24 |
127.69 |
141.71 |
118.97 |
114.37 |
|
|
R-2 |
Residential, multiple
family |
130.60 |
125.33 |
121.35 |
115.49 |
106.19 |
102.65 |
116.67 |
93.92 |
89.32 |
|
|
R-3 |
Residential, one-and
two-family |
123.28 |
119.90 |
116.97 |
113.77 |
109.66 |
106.79 |
111.84 |
102.72 |
96.83 |
|
|
R-4 |
Residential, care/assisted
living facilities |
153.80 |
148.53 |
144.55 |
138.69 |
129.50 |
125.96 |
139.98 |
117.23 |
112.64 |
|
|
S-1 |
Storage, moderate hazard |
86.15 |
81.89 |
76.78 |
74.05 |
65.75 |
62.57 |
70.80 |
52.97 |
49.76 |
|
|
S-2 |
Storage, low hazard |
85.15 |
80.89 |
76.78 |
73.05 |
65.75 |
61.57 |
69.80 |
52.97 |
48.76 |
|
|
U |
Utility, miscellaneous |
65.81 |
62.22 |
58.51 |
55.59 |
50.20 |
46.80 |
52.46 |
39.63 |
37.72 |
|
|
|
|||||||||||
|
a. Private Garages use Utility, miscellaneous |
c. For shell only buildings deduct 20 percent |
||||||||||
|
b. Unfinished basements (all use groups) =
$15.00 per sq. ft. |
d. N.P. = Not Permitted |
||||||||||
6.
XIV. Fuel Gas Burner Fees. (Propane and Natural Gas Only):
For a residential replacement, conversion, or new burner installation
With appliance BTU input rate up to 200,000 BTUs $25.00
For light commercial appliance BTU input rates of over 200,000 BTUs
and up to one million BTUs . $37.00
Heavy commercial appliances BTU input rates of one million BTUs to
Two million BTUs .. $61.00
Industrial appliance BTU input rates over two million BTUs $85.00
7.